Handrail support Aluminium for screws with cover rose | GSV-No. 2023
22. May 2019
Handrail support Aluminium for screws | GSV-No. 2021
22. May 2019
Show all

Handrail support Aluminium for screws | GSV-No. 2020

SKU: 2020

Standard product

Submit requested length

lenght on request

Featured Video
Description

Handrail support
GSV-No. 2020
with cover rose, clamped
aluminium

Additional information
Weight 0,24 kg
HS-Code

Product class

Sales unit

General information on delivery times for products with no stock

General note: the general delivery times as stated below can deviate in certain cases due of supply shortages!

Brass:

• The general delivery time for products in brass satin chromed is currently 6 weeks

• The general delivery time for products in brass polished / brass polished chromed is currently 8 weeks

Stainless Steel:

• The general delivery time for products in stainless steel is currently 4 weeks

• The general delivery time for products in stainless steel polished / fine grind is currently 6 weeks

Aluminum:

• The general delivery time for products in Aluminum silver andodized is currently 4-6 weeks

• The general delivery time for products in Aluminum powder coated is currently 6-8 weeks

DIN EN ISO 9001:2015 management certificate
QR Code

QR Code

QR Code
Why avoiding hardware from house construction in shipbuilding is of highest importance
You need technical assistance for this product? Contact us directly
*required