Handrail support with joint Aluminium | GSV-No. 2870
1. February 2019
Handrail support T-shape | GSV-No. 2852
1. February 2019
Show all

Handrail support Aluminium with cover rose | GSV-No. 2332

SKU: 2332

Standard product

Submit requested length

Featured Video
Description

Handrail support
GSV-No. 2332
with cover rose, clamped
aluminium

Additional information
Weight N/A
HS-Code

Product class

Sales unit

General information on delivery times for products with no stock

General note: the general delivery times as stated below can deviate in certain cases due of supply shortages!

Brass:

• The general delivery time for products in brass satin chromed is currently 6 weeks

• The general delivery time for products in brass polished / brass polished chromed is currently 8 weeks

Stainless Steel:

• The general delivery time for products in stainless steel is currently 4 weeks

• The general delivery time for products in stainless steel polished / fine grind is currently 6 weeks

Aluminum:

• The general delivery time for products in Aluminum silver andodized is currently 4-6 weeks

• The general delivery time for products in Aluminum powder coated is currently 6-8 weeks

DIN EN ISO 9001:2015 management certificate
QR Code

QR Code

QR Code
Why avoiding hardware from house construction in shipbuilding is of highest importance
You need technical assistance for this product? Contact us directly
*required