Handrail support with joint Aluminium | GSV-No. 2870
1. February 2019Handrail support T-shape | GSV-No. 2852
1. February 2019Handrail support
GSV-No. 2332
with cover rose, clamped
aluminium
Weight | N/A |
---|---|
HS-Code | |
Product class | |
Sales unit |
General note: the general delivery times as stated below can deviate in certain cases due of supply shortages!
Brass:
• The general delivery time for products in brass satin chromed is currently 6 weeks
• The general delivery time for products in brass polished / brass polished chromed is currently 8 weeks
Stainless Steel:
• The general delivery time for products in stainless steel is currently 4 weeks
• The general delivery time for products in stainless steel polished / fine grind is currently 6 weeks
Aluminum:
• The general delivery time for products in Aluminum silver andodized is currently 4-6 weeks
• The general delivery time for products in Aluminum powder coated is currently 6-8 weeks