Mortise deadlock for cylinder Brass | GSV-No. 3201 ZR
2. February 2019
Dog assemblies with handle and square shaft 73/93mm Steel | GSV-No. 104 type B
3. February 2019
Show all

Pressure fork for M12 / M16 / M20 | GSV-No. 407 C

SKU: 407 C

Standard product

Description

Pressure fork
GSV-No. 407 C
steel self color

Downloads

Additional information
Weight N/A
Product class

HS-Code

Sales unit

DIN

General information on delivery times for products with no stock

Due to the general shortage of skilled workers, we are experiencing delays in our manufacturing process. While we are continuously working on solutions, yet we have not achieved any sustainable improvements. Therefore, all stated delivery dates are subject to reservation.

Brass:

• The general delivery time for products in brass satin chromed is currently 8-10 weeks

• The general delivery time for products in brass polished / brass polished chromed is currently 10 weeks

Stainless Steel:

• The general delivery time for products in stainless steel is currently 8 weeks

• The general delivery time for products in stainless steel polished / fine grind is currently 8-10 weeks

Aluminum:

• The general delivery time for products in Aluminum silver andodized is currently 8 weeks

• The general delivery time for products in Aluminum powder coated is currently 8-10 weeks

DIN EN ISO 9001:2015 management certificate
QR Code

QR Code

QR Code
Why avoiding hardware from house construction in shipbuilding is of highest importance
You need technical assistance for this product? Contact us directly
*required