Cabinet stay with set-screw | stop lengths 195 / 220 / 300mm Brass | GSV-No. 2653 A
19. February 2019
Wardrobe fastener Brass | GSV-No. 6295
19. February 2019
Show all

Cabinet stay with guide-rivet lengths 195 / 220 / 300mm Brass | GSV-No. 2652

SKU: 2652

Standard product

Featured Videos
Description

The cabinet stay with guide-rivet, GSV-No. 2652, is a precision-engineered hardware component designed for secure and reliable support of cabinet doors, hatches, or lids. Manufactured from solid brass, the stay combines high mechanical strength, corrosion resistance, and long-term durability, making it suitable for frequent use and demanding environments, including residential, commercial, and maritime applications.

Equipped with a guide-rivet and two sturdy mounting brackets, the cabinet stay ensures precise guidance of the door or hatch during opening and closing. This design provides smooth, play-free operation, prevents unintentional slamming, and distributes mechanical forces evenly to minimize wear on both the stay and the mounted door. The mounting brackets measure 40 x 22 mm, providing stable attachment points for secure installation.

The holes are countersunk according to DIN 74-A4, allowing screws to sit flush with the surface for a neat, professional finish while preventing mechanical damage to adjacent surfaces. The brass construction maintains its appearance over time, offering both functional reliability and aesthetic appeal.

Overall, the GSV-No. 2652 cabinet stay with guide-rivet provides a technically advanced, durable, and dependable solution for cabinet doors and hatches. Its robust brass construction, precision-guided mechanism, and thoughtfully designed mounting system ensure long-term stability, smooth operation, and minimal maintenance requirements in a wide range of applications.

General information on delivery times for products with no stock

Current general delivery dates subject to the usual reservations::

Brass:

• The general delivery time for products in brass satin chromed is currently 6-8 weeks

• The general delivery time for products in brass polished / brass polished chromed is currently 8-10 weeks

Stainless Steel:

• The general delivery time for products in stainless steel is currently 6 weeks

• The general delivery time for products in stainless steel polished / fine grind is currently 6-8 weeks

Aluminum:

• The general delivery time for products in Aluminum silver andodized is currently 6 weeks

• The general delivery time for products in Aluminum powder coated is currently 6-8 weeks

Special/project products:

No standard delivery time, as components are only made to order. In each case by individual arrangement

Additional information
Weight N/A
HS-Code

Product type

Area of product installation

,

Sales unit

Product class

Note on express dispatch | 24 delivery serviceNote on express dispatch | 24 delivery service

Each item with a stock quantity can be dispatched within 24 hours. The surcharge for the 24h delivery service is 5%.

DIN EN ISO 9001:2015 management certificate
Note on chemical hazardous substances

Our products do not contain the following chemical hazardous substances:

Asbestos
Polychlorinated biphenyls (PCBs)
Chlorofluorocarbons (CFCs)
Halons
Carbon tetrachloride
1-1-1-Trichloroethane
Hydrochlorofluorocarbons
Hydrobromofluorocarbons
Methyl bromide
Bromochloromethane
Anti-fouling systems containing organotin compounds as a biocide
Cadmium and cadmium compounds
Hexavalent chromium and hexavalent chromium compounds
Lead and lead compounds larger 3%
Mercury and mercury compounds
Polybrominated biphenyl (PBBs)
Polybrominated dephenyl ethers (PBDEs)
Polychloronaphthalenes (Cl >= 3)
Radioactive substances
Certain shortchain chlorinated paraffins
Perfluorooctane sulfonic acid (PFOS)
Brominated Flame Retardant (HBCDD)

You need technical assistance for this product? Contact us directly
*required fields