Floor bracket Ø 64mm Brass | GSV-No. 3470
7. Februar 2019
Chair lashing Brass length up to 600mm | GSV-No. 5362
7. Februar 2019
Show all

Chair lashing with chain in lengths 235-415mm Brass | GSV-No. 4669

SKU: 4669

Standard product

Downloads

Description

The chair lashing with chain in lengths from 235 to 415 mm (GSV No. 4669) is a technical connecting element designed for the secure and permanent fastening of seats or movable equipment in dynamic operational environments. Typical areas of application include public transport systems such as buses, trams, or trains, as well as ships and special-purpose vehicles. Manufactured from solid brass, the component offers excellent corrosion resistance, high mechanical strength, and long service life—even under demanding climatic conditions with high humidity or salty air.

The system consists of two sturdy end fittings connected by a durable metal chain. This chain allows for flexible adaptation to various installation conditions, with the adjustable length range of 235 to 415 mm providing broad versatility for different mounting scenarios. As such, the product is suitable for both series production and custom modifications or retrofits. The play-free construction minimizes operational vibrations and prevents the development of noise, which is a significant quality advantage in areas close to passengers.

The end fittings are equipped with standardized mounting holes, ensuring simple, precise, and repeatable installation. Future disassembly or replacement can also be carried out quickly and efficiently with minimal material wear. The smooth, visually appealing surface of the brass components allows for use in visible areas as well. Overall, this chair lashing impresses with its high functionality, ease of installation, and robust design, making it ideal for safety-relevant applications in mobile environments.

Additional information
Weight N/A
Produktklasse

Handelseinheit

HS-Code

Produkteinsatzbereich

Produkttyp

General information on delivery times for products with no stock

Due to the general shortage of skilled workers, there are still delays in our manufacturing process. We are continually working on solutions and have been able to make slight improvements. Therefore, all stated delivery dates are subject to reservation.

Brass:

• The general delivery time for products in brass satin chromed is currently 6-8 weeks

• The general delivery time for products in brass polished / brass polished chromed is currently 8-10 weeks

Stainless Steel:

• The general delivery time for products in stainless steel is currently 6 weeks

• The general delivery time for products in stainless steel polished / fine grind is currently 6-8 weeks

Aluminum:

• The general delivery time for products in Aluminum silver andodized is currently 6 weeks

• The general delivery time for products in Aluminum powder coated is currently 6-8 weeks

Special/project products:

No standard delivery time, as components are only made to order. In each case by individual arrangement

Note on express dispatch | 24 delivery serviceNote on express dispatch | 24 delivery service

Each item with a stock quantity can be dispatched within 24 hours. The surcharge for the 24h delivery service is 5%.

DIN EN ISO 9001:2015 management certificate
Note on chemical hazardous substances

Our products do not contain the following chemical hazardous substances:

Asbestos
Polychlorinated biphenyls (PCBs)
Chlorofluorocarbons (CFCs)
Halons
Carbon tetrachloride
1-1-1-Trichloroethane
Hydrochlorofluorocarbons
Hydrobromofluorocarbons
Methyl bromide
Bromochloromethane
Anti-fouling systems containing organotin compounds as a biocide
Cadmium and cadmium compounds
Hexavalent chromium and hexavalent chromium compounds
Lead and lead compounds larger 3%
Mercury and mercury compounds
Polybrominated biphenyl (PBBs)
Polybrominated dephenyl ethers (PBDEs)
Polychloronaphthalenes (Cl >= 3)
Radioactive substances
Certain shortchain chlorinated paraffins
Perfluorooctane sulfonic acid (PFOS)
Brominated Flame Retardant (HBCDD)

Why avoiding hardware from house construction in shipbuilding is of highest importance
You need technical assistance for this product? Contact us directly
*required fields