Bearing profile without fixing holes plastic | GSV-No. 2873
1. February 2019Handrail support with joint Aluminium | GSV-No. 2344
1. February 2019Handrail support T-shape
GSV-Nr. 2852
aluminium
Due to the general shortage of skilled workers, there are still delays in our manufacturing process. We are continually working on solutions and have been able to make slight improvements. Therefore, all stated delivery dates are subject to reservation.
Brass:
• The general delivery time for products in brass satin chromed is currently 6-8 weeks
• The general delivery time for products in brass polished / brass polished chromed is currently 8-10 weeks
Stainless Steel:
• The general delivery time for products in stainless steel is currently 6 weeks
• The general delivery time for products in stainless steel polished / fine grind is currently 6-8 weeks
Aluminum:
• The general delivery time for products in Aluminum silver andodized is currently 6 weeks
• The general delivery time for products in Aluminum powder coated is currently 6-8 weeks
Each item with a stock quantity can be dispatched within 24 hours. The surcharge for the 24h delivery service is 5%.
Our products do not contain the following chemical hazardous substances:
Substance |
---|
Asbestos |
Polychlorinated biphenyls (PCBs) |
Chlorofluorocarbons (CFCs) |
Halons |
Other fully halogenated CFCs |
Carbon tetrachloride |
1-1-1-Trichloroethane |
Hydrochlorofluorocarbons |
Hydrobromofluorocarbons |
Methyl bromide |
Bromochloromethane |
Anti-fouling systems containing organotin compounds as a biocide |
Cadmium and cadmium compounds |
Hexavalent chromium and hexavalent chromium compounds |
Lead and lead compounds larger 3% |
Mercury and mercury compounds |
Polybrominated biphenyl (PBBs) |
Polybrominated dephenyl ethers (PBDEs) |
Polychloronaphthalenes (Cl >= 3) |
Radioactive substances |
Certain shortchain chlorinated paraffins |
Perfluorooctane sulfonic acid (PFOS) |
Brominated Flame Retardant (HBCDD) |