
Handrail support Aluminium for screws with cover rose | GSV-No. 2022
1. February 2019The connector GSV-No. 2316 is a precisely manufactured component made from high-quality aluminum, designed specifically for use with the GSV 2309 square handrail system. It serves as a critical joining element, enabling two handrail segments to be connected securely and accurately, ensuring structural stability and continuity within the handrail system. The connector provides a robust and reliable interface, maintaining alignment and functionality while also contributing to the overall aesthetic appearance of the installation.
Manufactured from corrosion-resistant aluminum, the GSV-No. 2316 combines high strength with low weight, facilitating easy handling and installation without compromising durability. The material is engineered to withstand mechanical stress, regular use, and environmental factors, making the connector suitable for both indoor and outdoor applications. Its precisely machined surfaces allow for an exact fit with the GSV 2309 handrail system, ensuring a seamless connection that preserves the visual and functional integrity of the handrail.
By using the GSV-No. 2316 connector, handrail segments are securely joined, reducing the risk of misalignment or structural weakness, while also extending the lifespan of the entire system. The component supports ergonomic handrail continuity and ensures compliance with relevant safety standards and building regulations. With its durable aluminum construction, high-quality finish, and precise engineering, this connector provides a reliable, long-lasting, and technically advanced solution for modern staircases and railing systems, fulfilling both functional and aesthetic requirements.
Current general delivery dates subject to the usual reservations::
Brass:
• The general delivery time for products in brass satin chromed is currently 6-8 weeks
• The general delivery time for products in brass polished / brass polished chromed is currently 8-10 weeks
Stainless Steel:
• The general delivery time for products in stainless steel is currently 6 weeks
• The general delivery time for products in stainless steel polished / fine grind is currently 6-8 weeks
Aluminum:
• The general delivery time for products in Aluminum silver andodized is currently 6 weeks
• The general delivery time for products in Aluminum powder coated is currently 6-8 weeks
Special/project products:
No standard delivery time, as components are only made to order. In each case by individual arrangement
| Weight | N/A |
|---|---|
| HS-Code | |
| Product class | |
| Product type | |
| Area of product installation | |
| Sales unit | |
| Material |
Note on express dispatch | 24 delivery service Each item with a stock quantity can be dispatched within 24 hours. The surcharge for the 24h delivery service is 5%.
Our products do not contain the following chemical hazardous substances:
Asbestos
Polychlorinated biphenyls (PCBs)
Chlorofluorocarbons (CFCs)
Halons
Carbon tetrachloride
1-1-1-Trichloroethane
Hydrochlorofluorocarbons
Hydrobromofluorocarbons
Methyl bromide
Bromochloromethane
Anti-fouling systems containing organotin compounds as a biocide
Cadmium and cadmium compounds
Hexavalent chromium and hexavalent chromium compounds
Lead and lead compounds larger 3%
Mercury and mercury compounds
Polybrominated biphenyl (PBBs)
Polybrominated dephenyl ethers (PBDEs)
Polychloronaphthalenes (Cl >= 3)
Radioactive substances
Certain shortchain chlorinated paraffins
Perfluorooctane sulfonic acid (PFOS)
Brominated Flame Retardant (HBCDD)









