
Handrail support Aluminium for screws with cover rose | GSV-No. 2022
1. February 2019The end piece GSV-No. 2316 A is a precisely engineered component made from high-quality aluminum, specifically designed for use with the GSV 2309 square handrail system. It functions as a terminal element for the handrail, providing a stable, secure, and technically accurate endpoint. This end piece ensures a reliable connection between the handrail and walls, posts, or other supporting structures, contributing to the overall structural integrity and longevity of the handrail system.
Constructed from corrosion-resistant aluminum, the GSV-No. 2316 A end piece combines high strength with low weight, making handling and installation straightforward while ensuring long-term durability. Its robust material properties allow it to withstand mechanical stress, daily wear, and exposure to environmental conditions, making it suitable for both interior and exterior applications. The precisely machined surfaces provide an exact fit with the GSV 2309 handrail system, resulting in a seamless, flush connection that maintains both the functional performance and visual quality of the installation.
By incorporating the GSV-No. 2316 A end piece, the open end of the handrail is effectively protected from damage, wear, and environmental influences, enhancing both safety and longevity. Its design supports ergonomic handrail use and allows for compliance with applicable standards and building codes. With its high-quality aluminum construction, precise manufacturing, and functional design, this end piece offers a reliable, long-lasting, and professionally finished solution for modern staircases and handrail systems, meeting both technical and aesthetic requirements.
Current general delivery dates subject to the usual reservations::
Brass:
• The general delivery time for products in brass satin chromed is currently 6-8 weeks
• The general delivery time for products in brass polished / brass polished chromed is currently 8-10 weeks
Stainless Steel:
• The general delivery time for products in stainless steel is currently 6 weeks
• The general delivery time for products in stainless steel polished / fine grind is currently 6-8 weeks
Aluminum:
• The general delivery time for products in Aluminum silver andodized is currently 6 weeks
• The general delivery time for products in Aluminum powder coated is currently 6-8 weeks
Special/project products:
No standard delivery time, as components are only made to order. In each case by individual arrangement
| Weight | N/A |
|---|---|
| Product class | |
| HS-Code | |
| Material | |
| Product type | |
| Area of product installation | |
| Sales unit |
Note on express dispatch | 24 delivery service Each item with a stock quantity can be dispatched within 24 hours. The surcharge for the 24h delivery service is 5%.
Our products do not contain the following chemical hazardous substances:
Asbestos
Polychlorinated biphenyls (PCBs)
Chlorofluorocarbons (CFCs)
Halons
Carbon tetrachloride
1-1-1-Trichloroethane
Hydrochlorofluorocarbons
Hydrobromofluorocarbons
Methyl bromide
Bromochloromethane
Anti-fouling systems containing organotin compounds as a biocide
Cadmium and cadmium compounds
Hexavalent chromium and hexavalent chromium compounds
Lead and lead compounds larger 3%
Mercury and mercury compounds
Polybrominated biphenyl (PBBs)
Polybrominated dephenyl ethers (PBDEs)
Polychloronaphthalenes (Cl >= 3)
Radioactive substances
Certain shortchain chlorinated paraffins
Perfluorooctane sulfonic acid (PFOS)
Brominated Flame Retardant (HBCDD)









