
End bracket Ø 26mm Brass | GSV-No. 2674 G
1. February 2019
Back plate | GSV-No. 2391
1. February 2019The end piece GSV-No. 2324 is a precisely engineered component made from high-quality aluminium, specifically designed for the square handrail system GSV 2309. This end piece serves as a functional and visually clean termination for the handrail, ensuring that the open ends of the profile are safely covered. By providing a secure closure, it protects the handrail from mechanical damage, moisture penetration, and the accumulation of dust or debris, all of which can negatively impact the durability and structural integrity of the system over time.
Manufactured from robust aluminium, the end piece combines a low weight with high mechanical strength, making it suitable for both residential and commercial applications. The material offers excellent corrosion resistance and long-term stability, ensuring that the handrail system maintains its performance and appearance even under demanding environmental conditions. The aluminium surface can be anodised or powder-coated to enhance its resistance to wear, corrosion, and UV exposure, while also allowing aesthetic integration with different interior or exterior designs.
Installation of the GSV-No. 2324 end piece is straightforward, as it is precisely dimensioned to fit the GSV 2309 handrail profile. It can be attached via mechanical fastening or simply fitted by sliding onto the handrail end, depending on the system configuration. The accurate manufacturing tolerances ensure a flush, seamless connection with the handrail, providing both functional stability and an aesthetically appealing finish.
This end piece is ideal for staircases, corridor handrails, and balustrade applications where a combination of durability, technical reliability, and clean design is required. By effectively sealing the handrail end, the GSV-No. 2324 contributes significantly to the overall longevity, safety, and visual consistency of the square handrail system GSV 2309.
Current general delivery dates subject to the usual reservations::
Brass:
• The general delivery time for products in brass satin chromed is currently 6-8 weeks
• The general delivery time for products in brass polished / brass polished chromed is currently 8-10 weeks
Stainless Steel:
• The general delivery time for products in stainless steel is currently 6 weeks
• The general delivery time for products in stainless steel polished / fine grind is currently 6-8 weeks
Aluminum:
• The general delivery time for products in Aluminum silver andodized is currently 6 weeks
• The general delivery time for products in Aluminum powder coated is currently 6-8 weeks
Special/project products:
No standard delivery time, as components are only made to order. In each case by individual arrangement
| Weight | N/A |
|---|---|
| Product class | |
| HS-Code | |
| Material | |
| Product type | |
| Area of product installation | |
| Sales unit |
Note on express dispatch | 24 delivery service Each item with a stock quantity can be dispatched within 24 hours. The surcharge for the 24h delivery service is 5%.
Our products do not contain the following chemical hazardous substances:
Asbestos
Polychlorinated biphenyls (PCBs)
Chlorofluorocarbons (CFCs)
Halons
Carbon tetrachloride
1-1-1-Trichloroethane
Hydrochlorofluorocarbons
Hydrobromofluorocarbons
Methyl bromide
Bromochloromethane
Anti-fouling systems containing organotin compounds as a biocide
Cadmium and cadmium compounds
Hexavalent chromium and hexavalent chromium compounds
Lead and lead compounds larger 3%
Mercury and mercury compounds
Polybrominated biphenyl (PBBs)
Polybrominated dephenyl ethers (PBDEs)
Polychloronaphthalenes (Cl >= 3)
Radioactive substances
Certain shortchain chlorinated paraffins
Perfluorooctane sulfonic acid (PFOS)
Brominated Flame Retardant (HBCDD)









