
Handrail support Aluminium for screws with cover rose | GSV-No. 2022
1. February 2019The handrail bracket GSV-No. 2398 A is a precisely engineered component made from high-quality aluminum, specifically designed for use with the GSV 2309 square handrail system. It serves as a critical support element, providing a secure and stable connection between the handrail and its mounting surface. By ensuring that the handrail is properly aligned and firmly anchored, the bracket contributes significantly to the structural integrity and safety of the handrail system, making it suitable for both residential and commercial applications.
Constructed from corrosion-resistant aluminum, the GSV-No. 2398 A combines high strength with low weight, facilitating ease of handling and installation while maintaining long-term durability. The material is engineered to resist mechanical stress, wear, and environmental influences, which makes it appropriate for both indoor and outdoor use. The precisely machined surfaces and standardized dimensions guarantee an exact fit with the GSV 2309 handrail system, allowing for a seamless and flush connection that preserves the aesthetic and functional quality of the overall installation.
The GSV-No. 2398 A handrail bracket effectively supports the handrail along its length, preventing deflection and ensuring consistent ergonomic alignment for safe handhold. Its design enables a norm-compliant installation that meets relevant safety and building standards. With its robust construction, precise engineering, and high-quality aluminum material, this bracket provides a durable, reliable, and technically advanced solution for modern handrail installations. It ensures both safety and a professional, visually appealing finish in stair and railing systems.
Current general delivery dates subject to the usual reservations::
Brass:
• The general delivery time for products in brass satin chromed is currently 6-8 weeks
• The general delivery time for products in brass polished / brass polished chromed is currently 8-10 weeks
Stainless Steel:
• The general delivery time for products in stainless steel is currently 6 weeks
• The general delivery time for products in stainless steel polished / fine grind is currently 6-8 weeks
Aluminum:
• The general delivery time for products in Aluminum silver andodized is currently 6 weeks
• The general delivery time for products in Aluminum powder coated is currently 6-8 weeks
Special/project products:
No standard delivery time, as components are only made to order. In each case by individual arrangement
| Weight | N/A |
|---|---|
| HS-Code | |
| Product class | |
| Product type | |
| Area of product installation | |
| Sales unit |
Note on express dispatch | 24 delivery service Each item with a stock quantity can be dispatched within 24 hours. The surcharge for the 24h delivery service is 5%.
Our products do not contain the following chemical hazardous substances:
Asbestos
Polychlorinated biphenyls (PCBs)
Chlorofluorocarbons (CFCs)
Halons
Carbon tetrachloride
1-1-1-Trichloroethane
Hydrochlorofluorocarbons
Hydrobromofluorocarbons
Methyl bromide
Bromochloromethane
Anti-fouling systems containing organotin compounds as a biocide
Cadmium and cadmium compounds
Hexavalent chromium and hexavalent chromium compounds
Lead and lead compounds larger 3%
Mercury and mercury compounds
Polybrominated biphenyl (PBBs)
Polybrominated dephenyl ethers (PBDEs)
Polychloronaphthalenes (Cl >= 3)
Radioactive substances
Certain shortchain chlorinated paraffins
Perfluorooctane sulfonic acid (PFOS)
Brominated Flame Retardant (HBCDD)














