
End bracket Ø 26mm Brass | GSV-No. 2674 G
1. February 2019
Back plate | GSV-No. 2391
1. February 2019The handrail support GSV-No. 2022 is a precision-engineered component made from high-quality aluminium, designed specifically for secure mounting of wooden handrails. It provides a robust and stable connection between the handrail and the wall, ensuring safety, durability, and long-term performance. This handrail support is designed for installation using countersunk screws, allowing a flush and secure attachment to the mounting surface. A cover rose is integrated into the design to conceal the screw heads, providing a clean and aesthetically pleasing finish.
Constructed from corrosion-resistant aluminium, the GSV-No. 2022 support combines lightweight properties with high structural strength, making it suitable for both residential and commercial applications. The material’s durability ensures long-term resistance to wear, mechanical stress, and environmental influences such as humidity, making it appropriate for both interior and sheltered exterior installations. The aluminium surface can be anodised or powder-coated, providing additional protection against corrosion and wear, as well as allowing integration with various design schemes and colour requirements.
The length of the handrail support can be customised to suit specific installation requirements, providing flexibility for different wall distances and handrail heights. The precisely manufactured design ensures a tight, stable fit with wooden handrails, eliminating wobbling or misalignment during use. Installation is straightforward, with the countersunk screws providing secure mechanical fastening while the cover rose conceals the mounting hardware for a professional appearance.
The GSV-No. 2022 handrail support is ideal for staircases, corridors, or public spaces where both safety and aesthetics are important. Its combination of structural reliability, corrosion resistance, and clean design makes it a technically sound and visually appealing solution for wooden handrail installations.
Current general delivery dates subject to the usual reservations::
Brass:
• The general delivery time for products in brass satin chromed is currently 6-8 weeks
• The general delivery time for products in brass polished / brass polished chromed is currently 8-10 weeks
Stainless Steel:
• The general delivery time for products in stainless steel is currently 6 weeks
• The general delivery time for products in stainless steel polished / fine grind is currently 6-8 weeks
Aluminum:
• The general delivery time for products in Aluminum silver andodized is currently 6 weeks
• The general delivery time for products in Aluminum powder coated is currently 6-8 weeks
Special/project products:
No standard delivery time, as components are only made to order. In each case by individual arrangement
| Weight | 0,25 kg |
|---|---|
| HS-Code | |
| Product class | |
| Material | |
| Product type | |
| Area of product installation | |
| Sales unit |
Note on express dispatch | 24 delivery service Each item with a stock quantity can be dispatched within 24 hours. The surcharge for the 24h delivery service is 5%.
Our products do not contain the following chemical hazardous substances:
Asbestos
Polychlorinated biphenyls (PCBs)
Chlorofluorocarbons (CFCs)
Halons
Carbon tetrachloride
1-1-1-Trichloroethane
Hydrochlorofluorocarbons
Hydrobromofluorocarbons
Methyl bromide
Bromochloromethane
Anti-fouling systems containing organotin compounds as a biocide
Cadmium and cadmium compounds
Hexavalent chromium and hexavalent chromium compounds
Lead and lead compounds larger 3%
Mercury and mercury compounds
Polybrominated biphenyl (PBBs)
Polybrominated dephenyl ethers (PBDEs)
Polychloronaphthalenes (Cl >= 3)
Radioactive substances
Certain shortchain chlorinated paraffins
Perfluorooctane sulfonic acid (PFOS)
Brominated Flame Retardant (HBCDD)









