
End bracket Ø 26mm Brass | GSV-No. 2674 G
1. February 2019
Back plate | GSV-No. 2391
1. February 2019The handrail support GSV-No. 2398 MK is a precision-engineered component made from high-quality aluminum, specifically designed for the GSV 2309 square handrail system. This support is intended for installation using welding bolts and is equipped with Korrex isolating sockets No. 506, which provide electrical insulation between the support and the mounting hardware. These isolating sockets prevent galvanic corrosion and reduce material stress, ensuring the long-term durability and reliability of the handrail installation. The support serves as a structural connection between the handrail and the supporting surface, maintaining stability, load distribution, and alignment along the entire length of the handrail system.
Constructed from corrosion-resistant aluminum, the GSV-No. 2398 MK combines high mechanical strength with lightweight design, facilitating straightforward handling, transport, and installation while ensuring robust performance under load. The material properties allow the support to withstand daily mechanical stresses, environmental exposure, and long-term usage without deformation or compromise of structural integrity. Its precisely machined surfaces and dimensions ensure a secure and seamless connection to the GSV 2309 square handrail system, maintaining both functional performance and aesthetic quality.
When used in combination with appropriate handrail tubes, the GSV-No. 2398 MK support provides a reliable, ergonomic, and structurally sound solution for staircases or railing systems. It supports norm-compliant handrail placement, reduces stress on adjoining components, and ensures safe and consistent operation. With its high-quality aluminum construction, integrated Korrex insulating sockets, and precise engineering, this handrail support delivers a durable, technically advanced, and long-lasting solution for modern handrail installations, meeting both functional and visual standards.
Current general delivery dates subject to the usual reservations::
Brass:
• The general delivery time for products in brass satin chromed is currently 6-8 weeks
• The general delivery time for products in brass polished / brass polished chromed is currently 8-10 weeks
Stainless Steel:
• The general delivery time for products in stainless steel is currently 6 weeks
• The general delivery time for products in stainless steel polished / fine grind is currently 6-8 weeks
Aluminum:
• The general delivery time for products in Aluminum silver andodized is currently 6 weeks
• The general delivery time for products in Aluminum powder coated is currently 6-8 weeks
Special/project products:
No standard delivery time, as components are only made to order. In each case by individual arrangement
| Weight | N/A |
|---|---|
| Product class | |
| HS-Code | |
| Material | |
| Product type | |
| Area of product installation | |
| Sales unit |
Note on express dispatch | 24 delivery service Each item with a stock quantity can be dispatched within 24 hours. The surcharge for the 24h delivery service is 5%.
Our products do not contain the following chemical hazardous substances:
Asbestos
Polychlorinated biphenyls (PCBs)
Chlorofluorocarbons (CFCs)
Halons
Carbon tetrachloride
1-1-1-Trichloroethane
Hydrochlorofluorocarbons
Hydrobromofluorocarbons
Methyl bromide
Bromochloromethane
Anti-fouling systems containing organotin compounds as a biocide
Cadmium and cadmium compounds
Hexavalent chromium and hexavalent chromium compounds
Lead and lead compounds larger 3%
Mercury and mercury compounds
Polybrominated biphenyl (PBBs)
Polybrominated dephenyl ethers (PBDEs)
Polychloronaphthalenes (Cl >= 3)
Radioactive substances
Certain shortchain chlorinated paraffins
Perfluorooctane sulfonic acid (PFOS)
Brominated Flame Retardant (HBCDD)















