
End bracket Ø 26mm Brass | GSV-No. 2674 G
1. February 2019
Back plate | GSV-No. 2391
1. February 2019The link joint GSV-No. 2325 is a precisely engineered component made from high-quality aluminum, specifically designed for the GSV 2309 square handrail system. It serves as a flexible and robust connecting element between two handrail segments, enabling precise directional changes and angular adjustments within the handrail installation. This component ensures a mechanically stable, secure, and durable connection, maintaining the structural integrity of the handrail while allowing seamless continuity along staircases, corridors, or other architectural configurations.
Constructed from corrosion-resistant aluminum, the GSV-No. 2325 combines high strength with low weight, facilitating easy handling, transport, and installation without compromising durability. Its robust material properties enable the component to withstand mechanical stress, frequent usage, and environmental exposure, making it suitable for both indoor and outdoor applications. The precision-machined surfaces and standardized dimensions guarantee an exact fit with the GSV 2309 square handrail profiles, creating a seamless, flush connection that ensures both functional performance and a visually consistent appearance throughout the handrail system.
Integrating the GSV-No. 2325 link joint into a handrail assembly provides a reliable solution for connecting segments at corners or changes in direction while reducing stress on adjoining components. It enhances the stability of the entire handrail system, protects against deformation or misalignment, and supports ergonomic handrail positioning. With its high-quality aluminum construction, precise engineering, and versatile design, the GSV-No. 2325 link joint delivers a technically advanced, long-lasting, and aesthetically refined solution for modern square handrail installations, meeting both safety and functional standards.
Current general delivery dates subject to the usual reservations::
Brass:
• The general delivery time for products in brass satin chromed is currently 6-8 weeks
• The general delivery time for products in brass polished / brass polished chromed is currently 8-10 weeks
Stainless Steel:
• The general delivery time for products in stainless steel is currently 6 weeks
• The general delivery time for products in stainless steel polished / fine grind is currently 6-8 weeks
Aluminum:
• The general delivery time for products in Aluminum silver andodized is currently 6 weeks
• The general delivery time for products in Aluminum powder coated is currently 6-8 weeks
Special/project products:
No standard delivery time, as components are only made to order. In each case by individual arrangement
| Weight | N/A |
|---|---|
| Product class | |
| HS-Code | |
| Material | |
| Product type | |
| Area of product installation | |
| Sales unit |
Note on express dispatch | 24 delivery service Each item with a stock quantity can be dispatched within 24 hours. The surcharge for the 24h delivery service is 5%.
Our products do not contain the following chemical hazardous substances:
Asbestos
Polychlorinated biphenyls (PCBs)
Chlorofluorocarbons (CFCs)
Halons
Carbon tetrachloride
1-1-1-Trichloroethane
Hydrochlorofluorocarbons
Hydrobromofluorocarbons
Methyl bromide
Bromochloromethane
Anti-fouling systems containing organotin compounds as a biocide
Cadmium and cadmium compounds
Hexavalent chromium and hexavalent chromium compounds
Lead and lead compounds larger 3%
Mercury and mercury compounds
Polybrominated biphenyl (PBBs)
Polybrominated dephenyl ethers (PBDEs)
Polychloronaphthalenes (Cl >= 3)
Radioactive substances
Certain shortchain chlorinated paraffins
Perfluorooctane sulfonic acid (PFOS)
Brominated Flame Retardant (HBCDD)







