
Handrail support Aluminium for screws with cover rose | GSV-No. 2022
1. February 2019The stair end piece GSV-No. 2321 B is a precisely engineered component made from high-quality aluminum, specifically designed for use with the GSV 2309 square handrail system. It functions as a single-sided terminal element for the handrail, providing a stable, secure, and technically correct endpoint. The end piece ensures a reliable connection between the handrail and the adjacent surface, contributing to both the structural stability and the overall longevity of the handrail system.
Manufactured from durable, corrosion-resistant aluminum, this stair end piece combines high strength with low weight, making it easy to handle during installation while ensuring long-term performance. Its robust construction allows it to withstand mechanical stress, daily use, and exposure to environmental factors, making it suitable for both interior and exterior applications. The precisely machined surface guarantees exact compatibility with the GSV 2309 handrail system, ensuring a seamless, flush fit and a visually clean finish.
The GSV-No. 2321 B stair end piece protects the exposed end of the handrail from damage, wear, and environmental influences, significantly enhancing the system’s durability. Its single-sided design makes it ideal for installations where the handrail terminates at a wall, post, or endpoint, providing a secure and professional-looking transition. By combining functionality, material quality, and precise engineering, this component offers a reliable, norm-compliant, and long-lasting solution for modern stair and railing installations, ensuring both safety and aesthetic appeal.
Current general delivery dates subject to the usual reservations::
Brass:
• The general delivery time for products in brass satin chromed is currently 6-8 weeks
• The general delivery time for products in brass polished / brass polished chromed is currently 8-10 weeks
Stainless Steel:
• The general delivery time for products in stainless steel is currently 6 weeks
• The general delivery time for products in stainless steel polished / fine grind is currently 6-8 weeks
Aluminum:
• The general delivery time for products in Aluminum silver andodized is currently 6 weeks
• The general delivery time for products in Aluminum powder coated is currently 6-8 weeks
Special/project products:
No standard delivery time, as components are only made to order. In each case by individual arrangement
| Weight | N/A |
|---|---|
| Product class | |
| HS-Code | |
| Material | |
| Product type | |
| Area of product installation | |
| Sales unit |
Note on express dispatch | 24 delivery service Each item with a stock quantity can be dispatched within 24 hours. The surcharge for the 24h delivery service is 5%.
Our products do not contain the following chemical hazardous substances:
Asbestos
Polychlorinated biphenyls (PCBs)
Chlorofluorocarbons (CFCs)
Halons
Carbon tetrachloride
1-1-1-Trichloroethane
Hydrochlorofluorocarbons
Hydrobromofluorocarbons
Methyl bromide
Bromochloromethane
Anti-fouling systems containing organotin compounds as a biocide
Cadmium and cadmium compounds
Hexavalent chromium and hexavalent chromium compounds
Lead and lead compounds larger 3%
Mercury and mercury compounds
Polybrominated biphenyl (PBBs)
Polybrominated dephenyl ethers (PBDEs)
Polychloronaphthalenes (Cl >= 3)
Radioactive substances
Certain shortchain chlorinated paraffins
Perfluorooctane sulfonic acid (PFOS)
Brominated Flame Retardant (HBCDD)













