Double cylinder seawater resistant type in lengths from 30 / 30 to 70 / 70 with emergency function Brass | GSV-No. 362
Double cylinder seawater resistant type in lengths from 30 / 30 to 70 / 70 with emergency function Brass | GSV-No. 362
26. October 2020
Handrail round Aluminium in length of 3m or fix length per cut to order list | GSV-No. 2809
Handrail round Aluminium in length of 3m or fix length per cut to order list | GSV-No. 2809
13. November 2020
Show all

Rim lock for cylinder (stainless steel) with handle 4410 (Brass) preassembled | GSV-No. 3827 Z S001 / S002 / S002

SKU: 3827 Z S001 / S002

Featured Videos
Description

Rim lock for cylinder
GSV-No. 3827 Z S001 / S002
stainless steel
without cylinder
6 fixing holes
Handle Mscmr 4410/1 fixed but turnable pin located with hub

Additional information
Weight 1,727 kg
HS-Code

Product class

Sales unit

General information on delivery times for products with no stock

General note: the general delivery times as stated below can deviate in certain cases due of supply shortages!

Brass:

• The general delivery time for products in brass satin chromed is currently 6 weeks

• The general delivery time for products in brass polished / brass polished chromed is currently 8 weeks

Stainless Steel:

• The general delivery time for products in stainless steel is currently 4 weeks

• The general delivery time for products in stainless steel polished / fine grind is currently 6 weeks

Aluminum:

• The general delivery time for products in Aluminum silver andodized is currently 4-6 weeks

• The general delivery time for products in Aluminum powder coated is currently 6-8 weeks

Note on express dispatch | 24 delivery serviceNote on express dispatch | 24 delivery service

Each item with a stock quantity can be dispatched within 24 hours. The surcharge for the 24h delivery service is 5%.

DIN EN ISO 9001:2015 management certificate
Note on chemical hazardous substances

Our products do not contain the following chemical hazardous substances:

Substance
Asbestos
Polychlorinated biphenyls (PCBs)
Chlorofluorocarbons (CFCs)
Halons
Other fully halogenated CFCs
Carbon tetrachloride
1-1-1-Trichloroethane
Hydrochlorofluorocarbons
Hydrobromofluorocarbons
Methyl bromide
Bromochloromethane
Anti-fouling systems containing organotin compounds as a biocide
Cadmium and cadmium compounds
Hexavalent chromium and hexavalent chromium compounds
Lead and lead compounds larger 3%
Mercury and mercury compounds
Polybrominated biphenyl (PBBs)
Polybrominated dephenyl ethers (PBDEs)
Polychloronaphthalenes (Cl >= 3)
Radioactive substances
Certain shortchain chlorinated paraffins
Perfluorooctane sulfonic acid (PFOS)
Brominated Flame Retardant (HBCDD)
QR Code

QR Code

QR Code
Why avoiding hardware from house construction in shipbuilding is of highest importance
You need technical assistance for this product? Contact us directly
*required