Hasp and staple 150mm rolled Steel | GSV-No. 3408
1. March 2019Cabinet lock with push button and cylinder in Brass | GSV-No. 6039 Z
1. March 2019Ball catch
GSV-No. 4090
Brass
H = 16 mm
L1 = 38 mm
countersinking DIN 74-A3,5
Due to the general shortage of skilled workers, there are still delays in our manufacturing process. We are continually working on solutions and have been able to make slight improvements. Therefore, all stated delivery dates are subject to reservation.
Brass:
• The general delivery time for products in brass satin chromed is currently 6-8 weeks
• The general delivery time for products in brass polished / brass polished chromed is currently 8-10 weeks
Stainless Steel:
• The general delivery time for products in stainless steel is currently 6 weeks
• The general delivery time for products in stainless steel polished / fine grind is currently 6-8 weeks
Aluminum:
• The general delivery time for products in Aluminum silver andodized is currently 6 weeks
• The general delivery time for products in Aluminum powder coated is currently 6-8 weeks
Each item with a stock quantity can be dispatched within 24 hours. The surcharge for the 24h delivery service is 5%.
Our products do not contain the following chemical hazardous substances:
Asbestos
Polychlorinated biphenyls (PCBs)
Chlorofluorocarbons (CFCs)
Halons
Carbon tetrachloride
1-1-1-Trichloroethane
Hydrochlorofluorocarbons
Hydrobromofluorocarbons
Methyl bromide
Bromochloromethane
Anti-fouling systems containing organotin compounds as a biocide
Cadmium and cadmium compounds
Hexavalent chromium and hexavalent chromium compounds
Lead and lead compounds larger 3%
Mercury and mercury compounds
Polybrominated biphenyl (PBBs)
Polybrominated dephenyl ethers (PBDEs)
Polychloronaphthalenes (Cl >= 3)
Radioactive substances
Certain shortchain chlorinated paraffins
Perfluorooctane sulfonic acid (PFOS)
Brominated Flame Retardant (HBCDD)