Ventilation plate air space 70 / 100 / 150 / 200 / 250 cm2 Brass | GSV-No. 2537
13. February 2019
Cabinet stay with stop Brass | GSV-No. 4899
18. February 2019
Show all

Cabinet stay with stop length 250mm / 300mm Brass | GSV-No. 2658

SKU: 2658

Standard product

Featured Videos
Description

Cabinet stay
GSV-No. 2658
with stop
Brass

General information on delivery times for products with no stock

Due to the general shortage of skilled workers, there are still delays in our manufacturing process. We are continually working on solutions and have been able to make slight improvements. Therefore, all stated delivery dates are subject to reservation.

Brass:

• The general delivery time for products in brass satin chromed is currently 6-8 weeks

• The general delivery time for products in brass polished / brass polished chromed is currently 8-10 weeks

Stainless Steel:

• The general delivery time for products in stainless steel is currently 6 weeks

• The general delivery time for products in stainless steel polished / fine grind is currently 6-8 weeks

Aluminum:

• The general delivery time for products in Aluminum silver andodized is currently 6 weeks

• The general delivery time for products in Aluminum powder coated is currently 6-8 weeks

Note on express dispatch | 24 delivery serviceNote on express dispatch | 24 delivery service

Each item with a stock quantity can be dispatched within 24 hours. The surcharge for the 24h delivery service is 5%.

DIN EN ISO 9001:2015 management certificate
Note on chemical hazardous substances

Our products do not contain the following chemical hazardous substances:

Asbestos

Polychlorinated biphenyls (PCBs)

Chlorofluorocarbons (CFCs)

Halons

Carbon tetrachloride

1-1-1-Trichloroethane

Hydrochlorofluorocarbons

Hydrobromofluorocarbons

Methyl bromide

Bromochloromethane

Anti-fouling systems containing organotin compounds as a biocide

Cadmium and cadmium compounds

Hexavalent chromium and hexavalent chromium compounds

Lead and lead compounds larger 3%

Mercury and mercury compounds

Polybrominated biphenyl (PBBs)

Polybrominated dephenyl ethers (PBDEs)

Polychloronaphthalenes (Cl >= 3)

Radioactive substances

Certain shortchain chlorinated paraffins

Perfluorooctane sulfonic acid (PFOS)

Brominated Flame Retardant (HBCDD)

Why avoiding hardware from house construction in shipbuilding is of highest importance
You need technical assistance for this product? Contact us directly
*required fields